$15M is dirt cheap for the USA. That buys you like 100 yards of urban light rail or something. :)

If I did the math right, Seattle-area Federal Way Link Extension costs $185k per yard, getting 81 yards for $15M.

God we're terrible at building things.

Don't forget the decades of time it takes to build the tracks.

Is that the California high speed rail I see trying to hide in the back?

Shit, who cares how much it costs when it doesn't go useful places?

That’s like one decently sized house with a yard and garage in a good neighborhood in the bay area