20-40% capacity. Reserve available. Turnaround same day on a board (2 layer). Next day 4 layer. Two days exotic (rogers etc). Pick, place, soldered 2 days or delivered to lab immediately after panel cut.
If they had a fast production run in they could extend to 24 hours operation and triple base capacity.
They did a fair bit of TH though which was manually stuffed and wave soldered which could slow stuff down considerably.
Very interesting, I'm wondering if that low-utilization rate justifies the capex of building a line.
Low utilisation would be a good thing as they would value availability to the line very highly.
Yes and no, I could imagine a system where they have on demand capacity with a company like us and pay for that service.
It's mostly for security reasons. Both supply chain and secrecy.