> The IP problem is one of the central obstacles to closing the gap between simulation and production reality.

> “Whoever is manufacturing has to give or disclose their secret material properties to our simulation tool, and then we can say the simulation result could be well-correlated. Without that, there is no correlation.”

> The problem is that the most accurate material property data is also the most commercially sensitive.