I'm not the enemy of this progress at all and think it's a good thing. Same goes for the Celtic Interconnecter, though. My point is basically a) "coal-free" is misleading and this progress can be framed in other ways, and b) Ireland would have been better-served in terms of cost and environment to rely on even OCGTs than HFO.