Hmm not quite following: 500MW was created at connected to grid as required although delegated to 3rd party. And the DC uses that power. So what's the problem?
Hmm not quite following: 500MW was created at connected to grid as required although delegated to 3rd party. And the DC uses that power. So what's the problem?
500MW doesn't get built on the other side of the country when needed as the power has been sold
so there's a lag, but at this kind of scale you don't really care