It takes no longer than five minutes to cut through the poles used to hold this equipment up with a sawzall, when metal straps aren't used to attach it to existing infrastructure, I've been told.
It takes no longer than five minutes to cut through the poles used to hold this equipment up with a sawzall, when metal straps aren't used to attach it to existing infrastructure, I've been told.