BCP events. This makes so much sense. At a previous mega corp I was always confused why such emphasis was made on BCPs for war or natural disaster scenarios which are so rare compared to how much time was spent on the plans. Literally months later we had massive layoffs. The layoff was the (un)natural disaster they were preparing for!